2018 Streets Maintenance Project

The Town of Basalt and Grand River Construction will be making road improvements starting with crack sealing on Monday May 21st.  The Schedule will follow weather dependent with Swinging Bridge Lane, Riverside Drive, Pinon Drive, River Oaks Lane, and then move into the Willits area on the 24th and 25th.  Please see the attached schedule of work and timeline, all dates are weather depending and we will update the schedule as we get it.  Thank you for your patience as we improve the safety and beauty of our roadways.

Weather Depending the schedule for the 3/8 chip and fog seal is as follows.  There will be no street parking allowed on these dates and you may encounter delays enter or exiting your driveway- however no access will be entirely blocked off.  If there is a rain delay please plan on the same schedule going forward but pushed back until the following day. 

Any questions please call Matt Wagner at 970-927-4701 ext. 501. 

Thank you.

Riverside Dr                                        May 30, 20182.   

Meadow Ln                                         May 30, 20183.  

Swinging Bridge Ln                             May 30, 20184.   

Pinon Dr                                              May 30-31, 20185.   

River Oaks Ln                                     May 31, 2018

Apply the fog seal to all roads                         June 5, 2018